W2 Project Assignment “Project Week 2”

W2 Project Assignment “Project Week 2”

For these project assignments throughout the course you will need to reference the data in the ROI Excel spreadheet. Download it here.
Using the ROI data set:

For each of the 2 majors calculate the mean, median, minimum, maximum, range, and standard deviation for the columns ‘Cost’ and ’30-Year ROI’.
By hand or with Excel, for each of the 2 majors calculate the probability that a college picked from the column for ‘School Type’ is ‘Private’.
By hand or with Excel, for each of the 2 majors find the probability that a college with the ‘School Type’ ‘Private’ has a ’30-Year ROI’ between $1,500,000 and $1,800,000.

Grading Criteria Assignments
Maximum Points

Meets or exceeds established assignment criteria
40

Demonstrates an understanding of lesson concepts
20

Clearly presents well-reasoned ideas and concepts
30

Uses proper mechanics, punctuation, sentence structure, and spelling
10

Total
100