OPS571 OPS/571 Week 2 Quiz (21 out of 21)

1What is the term that refers to the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical, contemporary measures of performance, such as cost, quality, service, and speed (as cited in Jacobs & Chase, 2011, p. 461).
2Which of the following operations consulting tools provide summary performance updates for specific processes and are generally presented in graphical form with color-coding of trend lines and alarms?
3An advantage of a make-to-stock process is which of the following?
4Which of the following is a principle of reengineering?
5Which of the following is a situation that likely will yield economies of scale?
6Lean production seeks to achieve high volume production using which of the following?
7The basic notion of economies of scale assumes which of the following?
8In setting up a kanban control system, you need to determine the number of kanban card sets needed. If the average number of units demanded is 1,000 per hour, the lead time to replenish the order for this item is 10 hours, the container size is 5 units, and the safety stock is estimated to be 5% of the expected demand, what is the number of kanban card sets needed?
9Which of the following are possible examples of cycle times?
10Which of the following terms refers to a special type of flowcharting tool that is valuable for the development of lean processes?
11To implement a flow process in developing a lean system, a firm might do which of the following?
12In the pull system, which of the following is the partner that begins the process of pulling?
13If the run time for a batch of parts is 25 minutes on a machine, and the setup time is 75 minutes, which of the following is the operation time?
14Which of the following is one of the major types of stakeholders impacted by most consulting projects?
15Which of the following is a factor that causes a diseconomy of scale?
16In contrast to TQM, what approach seeks radical change through innovation?
17Which of the following operations consulting tools are used in the cost impact and payoff analysis stage in the operations consulting process?
18Which of the following production process terms best describes a stage in a multiple-stage process that limits the capacity of the overall process?
19Which of the following production process terms best describes the situation when activities in a stage of production must stop because there is no work?
20Which of the following is a key metric associated with value stream mapping?
21According to Little s law, which of the following can be used to estimate inventory?
The post OPS571 OPS/571 Week 2 Quiz (21 out of 21) appeared first on Class Assignments Help.
OPS571 OPS/571 Week 2 Quiz (21 out of 21) was first posted on September 28, 2022 at 2:05 pm.©2019 "Class Assignments Help". Use of this feed is for personal non-commercial use only. If you are not reading this article in your feed reader, then the site is guilty of copyright infringement. Please contact me at [email protected]